| Aeration Blower Replacement |
Capital Improvements |
$467,338 |
Replace two of the four original single-speed Aeration blowers with more
energy efficient high-speed, variable output turbine blowers.
Compressed air is the oxygen source for the activated sludge process's
Aeration Tanks. The original blowers were installed in
1984 and two of them are at the end of their service life. Project
includes electrical, mechanical, programming, and control changes to
support the new blowers and integrate them into the aeration system. |
08/26/11 |
 |
 |
8/5/12 |
|
| Digester Improvement/FOG-F2E |
Capital Improvements |
$5,787,000 |
Replace each digester's floating steel cover with a membrane cover, replace the digesters' gas mixing system with a more efficient pump mixing system, replace the biogas filtration equipment with a more effective system that uses safer to handle materials, and construct a new FOG/F2E (Food to Energy) facility. |
03/24/11 |
 |
 |
1/14/2013 |
|
| Administration Building Modifications |
Capital Improvements |
$568,200 |
Remodel existing women's locker room, Environmental Services storage, staff, and file spaces, create complete upgrade of administration building HVAC and fire alarm systems. Upgrade restroom plumbling fixtures throughout the treatment plant to meet latest MMWD water efficiency recommendtions. |
07/06/10 |
 |
 |
10/28/11 |
12/2/2011 |
| Biotower Rotary Distributor Reconditioning |
Capital Improvement - Asset Management |
$91,000 |
Disassemble existing rotary distributor (spray) arms for Biotower No. 2, remove and replace turntable bearing and first layer of filter media, replace spray arms and rotating tower assembly. |
10/01/09 |
 |
 |
3/26/10 |
7/15/10 |
| Outfall Interior Solids Removal |
Capital Improvements |
$289,420 |
Locate and uncover two Outfall diffuser section access ports, penetration dives to remove estimated 575 cubic yards of accumulated solids from interior of diffuser section, sidecast removed solids alongside diffuser section, extend 85 diffuser risers and replace 6 diffuser check valve assemblies. |
04/28/09 |
 |
 |
09/04/09 |
12/15/10 |
| Emergency Generator and Dechlorination System Improvement Project |
Capital Improvement |
$96,100 |
Install eductor distribution system for sodium hypochlorite, install emergency lighting for Agency power generating facility, construct backup cooling system for emergency generator, improved instrumentation. |
03/03/09 |
 |
 |
7/29/09 |
12/15/09 |
| Outfall Improvements |
Capital Improvements |
$550,450 |
Install internal WEKO seals on all 14 elastomeric connectors and 6 selected additional joints in Marine Outfall Pipeline. |
05/14/08 |
 |
 |
12/4/07
|
3/31/09 |
| Wet Weather Improvements |
Capital Improvement |
$35,550,000 |
Construct Rtaining Wall, Polymer Facility for Chemically Enhanced Primary Treatment, 2 new Primary Clarifiers, 2 new Chlorine Contact Station, Effluent Pump Station, and install new punch plate filter screens in Headworks, and various process improvements. |
10/08/07 |
 |
 |
4/10/10 |
8/15/10 |
| Effluent Storage Pond Improvements |
Capital Improvement |
$1,234,430 |
Remove existing pond liner, inlet/outlet structures and ac pavement. Bench, compact and build-up embankment per contract. Install new inlet/outlet structures, pond liner and ac pavement. |
04/27/07 |
 |
 |
11/2/07 |
01/04/08 |
| Roofing Improvements |
Capital Improvement |
$327,730 |
Replace built-up roofing and counterflashings on Headworks, Chlorination, Solids Handling and Digester Buildings |
03/27/07 |
 |
 |
6/15/07 |
8/14/07 |
| Pond Drain Pump Replacement |
Capital Improvement |
$155,000 |
Replace pond drain pump and associated piping. |
12/19/06 |
 |
 |
9/3/07 |
11/13/07 |
| Marine Outfall Inspection |
Inspection |
$100,510 |
Inspect entire interior length of marine outfall pipeline. |
07/05/06 |
 |
 |
3/13/07 |
04/17/07 |
| Vactor Receiving Station |
Construction |
$474,000 |
Demolish and relocate/replace Vactor and RV/Septage Receiving Stations |
06/06/06 |
 |
 |
11/30/06 |
03/18/07 |
| Indstrl Ctgs - Primary Clarifiers and Concrete Decks |
Construction |
$159,950 |
Repair and recoat metal parts in Primary Clarifiers No. 4 and 5. R&R concrete deck waterproof membrane /traffic coating system at Headworks and Aeration Basins. |
06/06/06 |
 |
 |
9/30/06 |
09/18/07 |
| Polymer Feed System Upgrade |
Construction |
$531,000 |
Replace liquid polymer handling, mixing, and metering for biosolids dewatering. |
04/04/06 |
 |
 |
03/15/07 |
04/20/07 |
| Diaphragm Metering Pumps (prepurchase) |
Equipment (Sole Source) |
$85,947.04 |
Supply 3 Milton Roy diaphragm metering pumps for injecting dilute polymer into centrifuge sludge feed |
04/04/06 |
 |
 |
7/31/06 |
04/20/07 |
| Polyblend Polymer Activation Units (prepurchase) |
Equipment (Sole Source) |
$30,402.07 |
Supply 2 US Filter/Stranco Polyblend liquid emulsion polymer mixers |
04/04/06 |
 |
 |
5/31/06 |
04/20/07 |
| Secondary Clarifier #2 and Miscellaneous Coating |
Construction |
$157,280 |
Secondary Clarifier #2, Biosolids Hoppers, & Concrete Deck Recoating |
07/07/05 |
 |
 |
11/30/05 |
2/28/06 |
| Security Fence Extension & Gate Automation |
Construction |
$83,800 |
Extend security fence to enclose Administration Building and parking lots, automate front entry gates |
02/01/05 |
 |
 |
5/27/05 |
07/14/05 |
| Cogen Engine Replacement |
Construction |
$1,800,000 |
Cogeneration Engine Replacement |
07/30/03 |
 |
 |
3/27/06 |
4/30/06 |