| Cogen Compressor |
Cogen |
|
CH2M Hill |
McKenna (Natoma) |
|
|
| Cogen dryer |
Cogen |
|
CH2M Hill |
Pneumatech Inc. |
|
|
| Cogen Engine |
Cogen |
|
CH2M Hill |
Waukesha |
|
|
| Cogen Siloxane Removal |
Cogen |
|
CH2M Hill |
Applied Filter Technology |
|
|
| Engine-Generator Cogeneration System |
Cogen |
|
CH2M Hill |
|
|
|
| Gas Mixing System Pump Replacements |
Cogen |
|
in-house |
|
|
|
| Dechlorination Phase I |
Dechlorination |
2003 |
in-house w/ K-J |
Maggiora and Ghilotti |
$97,060 |
$97,060 |
| Dechlorination Phase II |
Dechlorination |
|
in-house |
|
$0 |
|
| Aeration System Retrofit |
Aeration System Retrofit |
|
in-house |
in-house w/ Environmental Dynamics, Inc |
$72,000 |
$72,000 |
| Odor Control |
Odor Control |
|
Camp, Dresser, and McKee |
|
|
|
| Odor Control - Hydrogen Peroxide |
Odor Control |
1995 |
Camp, Dresser, and McKee |
Albay Construction |
$643,447 |
$879,221 |
| Odor Control - Nitrate |
Odor Control |
2000 |
in-house w/ Camp, Dresser, and McKee |
Pacific Mechanical Corp |
$277,506 |
$408,840 |
| Centrifuge Construction |
Centrifuge Construction |
2003 |
Kennedy-Jenks |
Schram |
$1,161,613 |
$1,321,579 |
| Process Control System Replacement |
Process Control System Replacement |
2003 |
Westin Eng |
Real Enterprise Solutions, Tresch Electric, Shayne Wilson |
$661,362 |
$874,922 |
| Secondary Clarifier #1 and DAF #2 Coatings |
Secondary Clarifier #1 and DAF #2 Coatings |
2003 |
in-house |
|
|
|
| Centrifuge Purchase |
Centrifuge Purchase |
2002 |
Kennedy-Jenks |
Centrisys |
|
|
| Marine Outfall Retrofit |
Marine Outfall Retrofit |
2003 |
Parker Diving |
|
|
|
| Marine Outfall Retrofit |
Marine Outfall Retrofit |
2002 |
in-house w/ K-J, Monismith, Risebrough |
North Coast Divers |
$361,923 |
$391,923 |
| Marine Outfall Retrofit |
Marine Outfall Retrofit |
2002 |
in-house |
Red Valve Company, others |
|
|
| Secondary Clarifier Coatings (Clar #4) |
Secondary Clarifier Coatings (Clar #4) |
2002 |
in-house |
Jeffco |
$77,000 |
$77,000 |
| Solar Power |
Solar Power |
2002 |
Brown and Caldwell |
|
|
|
| Secondary Clarifier Coatings |
Secondary Clarifier Coatings |
2001 |
in-house |
Robison-Prezioso |
$67,950 |
$67,950 |
| Headworks Lighting |
Headworks Lighting |
2000 |
in-house |
Steiny Electric |
$52,578 |
$52,578 |
| Underground Storage Tank Replacement |
Underground Storage Tank Replacement |
2000 |
John Sutfin |
Ft. Bragg Electric |
$113,671 |
$113,671 |
| AC Paving and Repair |
AC Paving and Repair |
1999 |
in-house |
Ghillotti |
$134,247 |
$134,247 |
| Cogen Engine Top-End Overhaul |
Cogen Engine Top-End Overhaul (1999) |
1999 |
in house w/ AETC (PO) |
Sierra Detroit Diesel |
$53,968 |
$53,968 |
| Secondary Clarifier Improvements |
Secondary Clarifier Improvements |
1999 |
Brown and Caldwell Consultants |
in-house w/ NEFCO |
$48,000 |
$75,332 |
| Cogeneration System Modifications |
Cogeneration System Modifications |
1998 |
Carollo Engineers |
Cal-Pac Energy |
|
|
| Marine Outfall Solids Removal |
Marine Outfall Solids Removal (1998) |
1998 |
in-house |
Water Resources |
$117,661 |
$117,661 |
| Engine Fuel Gas Compressors |
Engine Fuel Gas Compressors |
1997 |
Carollo Engineers |
Pego Systems |
|
|
| Grit System Improvements |
Grit System Improvements |
1997 |
Kennedy-Jenks Consultants |
Goebel Paving, Grading, and Underground |
$272,083 |
$337,703 |
| Marine Outfall Riser Maintenance |
Marine Outfall Riser Maintenance |
1997 |
in-house |
Inshore Divers |
$41,174 |
$41,174 |
| Utility Natural Gas Line |
Utility Natural Gas Line |
1997 |
Carollo Engineers |
PG&E |
$934,455 |
$1,108,468 |
| Cogen Engine Top-End Overhaul |
Cogen Engine Top-End Overhaul (1996) |
1996 |
in-house w/ AETC (PO) |
Sierra Power Products |
$53,158 |
$53,158 |
| Disinfection System Modifications |
Disinfection System Modifications |
1996 |
Brown and Caldwell Consultants |
Pacific Mechanical |
$2,165,422 |
$2,577,242 |
| Hot Water Supply / Return |
Hot Water Supply / Return |
1995 |
Kennedy-Jenks Consultants |
Marelich Mechanical |
$45,127 |
$45,127 |
| Primary Clarifier Coatings |
Primary Clarifier Coatings (1995) |
1995 |
in-house |
Blair Industrial Painting and Coatings |
$45,235 |
$45,235 |
| Secondary Clarifier Coating |
Secondary Clarifier Coating |
1995 |
in-house |
Robison-Prezioso |
$31,112 |
$31,112 |
| Ferric Chloride Facility |
Ferric Chloride Facility |
1994 |
G.S. Dodson |
Albay Construction |
$100,281 |
$100,281 |
| Maintenance Annex |
Maintenance Annex |
1994 |
in-house w/ K-J, Copple, Subsurface, Kleinfelder (all PO) |
Bursch & Radu |
$171,278 |
$171,278 |
| Marine Outfall Solids Removal |
Marine Outfall Solids Removal (1994) |
1994 |
in-house |
Coastal Divers / No. Coast Divers |
$198,954 |
$198,954 |
| Primary Digester Guide Rail Repairs |
Primary Digester Guide Rail Repairs |
1994 |
Westech, Bob Copple |
Townsend Brothers |
$68,667 |
$68,667 |
| Headworks Coating |
Headworks Coating |
1993 |
Lou Vincent |
W.G. Thompson |
$27,240 |
$27,240 |
| Primary Clarifier Coatings |
Primary Clarifier Coatings (1993) |
1993 |
Lou Vincent |
Redwood Painting |
$33,526 |
$33,526 |
|