The following are results from recent bids for contracts with CMSA. For a detailed bid list, click [checkbox]

Notes: Click on headers to sort by column;

(a): NTP - Notice To Proceed;

(b): Contract may be extended up to this date.

Contract Name Contract Type Est.Value Description Awarded NTPa Bid Open Date Projected or Actual Completion Contract Closeout
Secondary Clarifier #2 and Miscellaneous Coating Construction $157,280 Secondary Clarifier #2, Biosolids Hoppers, & Concrete Deck Recoating closed closed 7/7/05 11/30/05 2/28/06
Cogen Engine Replacement Construction $1,800,000 Cogeneration Engine Replacement closed closed 7/30/03 3/27/06 4/30/06
Security Fence Extension & Gate Automation Construction $83,800 Extend security fence to enclose Administration Building and parking lots, automate front entry gates closed closed 2/1/05 5/27/05 07/14/05
Polyblend Polymer Activation Units (prepurchase) Equipment (Sole Source) $30,402.07 Supply 2 US Filter/Stranco Polyblend liquid emulsion polymer mixers closed closed N/A 5/31/06 04/20/07
Polymer Feed System Upgrade Construction $531,000 Replace liquid polymer handling, mixing, and metering for biosolids dewatering. closed closed 4/4/06 03/15/07 04/20/07
Diaphragm Metering Pumps (prepurchase) Equipment (Sole Source) $85,947.04 Supply 3 Milton Roy diaphragm metering pumps for injecting dilute polymer into centrifuge sludge feed closed closed N/A 7/31/06 04/20/07
Indstrl Ctgs - Primary Clarifiers and Concrete Decks Construction $159,950 Repair and recoat metal parts in Primary Clarifiers No. 4 and 5. R&R concrete deck waterproof membrane /traffic coating system at Headworks and Aeration Basins. closed closed 6/6/06 9/30/06 09/18/07
Vactor Receiving Station Construction $474,000 Demolish and relocate/replace Vactor and RV/Septage Receiving Stations closed closed 6/6/06 11/30/06 03/18/07
Marine Outfall Inspection Inspection $100,510 Inspect entire interior length of marine outfall pipeline. closed closed 7/5/06 3/13/07 04/17/07
Pond Drain Pump Replacement Capital Improvement $155,000 Replace pond drain pump and associated piping. closed closed 12/19/06 9/3/07 11/13/07
Roofing Improvements Capital Improvement $327,730 Replace built-up roofing and counterflashings on Headworks, Chlorination, Solids Handling and Digester Buildings closed closed 3/27/07 6/15/07 8/14/07
Wet Weather Improvements Capital Improvement $35,550,000 Construct Rtaining Wall, Polymer Facility for Chemically Enhanced Primary Treatment, 2 new Primary Clarifiers, 2 new Chlorine Contact Station, Effluent Pump Station, and install new punch plate filter screens in Headworks, and various process improvements. closed closed 10/08/07 4/10/10 8/15/10
Outfall Improvements Capital Improvements $550,450 Install internal WEKO seals on all 14 elastomeric connectors and 6 selected additional joints in Marine Outfall Pipeline. closed closed 5/14/08

12/4/07

3/31/09
Effluent Storage Pond Improvements Capital Improvement $1,234,430 Remove existing pond liner, inlet/outlet structures and ac pavement. Bench, compact and build-up embankment per contract. Install new inlet/outlet structures, pond liner and ac pavement. closed closed 4/27/07 11/2/07 01/04/08
Emergency Generator and Dechlorination System Improvement Project Capital Improvement $96,100 Install eductor distribution system for sodium hypochlorite, install emergency lighting for Agency power generating facility, construct backup cooling system for emergency generator, improved instrumentation. closed closed 3/03/09 7/29/09 12/15/09
Outfall Interior Solids Removal Capital Improvements $289,420 Locate and uncover two Outfall diffuser section access ports, penetration dives to remove estimated 575 cubic yards of accumulated solids from interior of diffuser section, sidecast removed solids alongside diffuser section, extend 85 diffuser risers and replace 6 diffuser check valve assemblies. closed closed 4/28/09 09/04/09 12/15/10
Biotower Rotary Distributor Reconditioning Capital Improvement - Asset Management $91,000 Disassemble existing rotary distributor (spray) arms for Biotower No. 2, remove and replace turntable bearing and first layer of filter media, replace spray arms and rotating tower assembly. closed closed 10/1/09 3/26/10 7/15/10
Administration Building Modifications Capital Improvements   Remodel existing women's locker room, Environmental Services storage, staff, and file spaces, create complete upgrade of administration building HVAC and fire alarm systems. Upgrade restroom plumbling fixtures throughout the treatment plant to meet latest MMWD water efficiency recommendtions.     7/6/10